News

Gas Main Replacement Teams Required

in Sep 06, 2021

  We currently carry out Gas Mains Replacement, Reinforcements, Connections and Repair works on behalf of our client SGN.   Our teams have many years of experience and a wide range of competencies from Service Laying, Main Laying, Competent persons and specialist qualifications.   Our resources are required to flexible and committed to raising our[…]

Read more

Job Opening

in Feb 05, 2021

Water Main / Rehabilitation Teams As we enter into Scottish Waters next investment program SR21 Innovative Utilities (UK) are looking to increase our Water Main Laying Teams due to increased volumes of work with our clients on a Permanent basis. The Scottish Water SR21 program is over a 6 year period and we are looking[…]

Read more
Ditch Witch JT100 All Terrain Directional Drilling Rig

Ditch Witch JT100 All Terrain Directional Drilling Rig

in Jun 27, 2019

The JT100 produces 268-hp (200-kW) which makes it an incredibly powerful machine, but it’s not just the power which makes it so productive—it’s how the power is distributed. The JT100 is designed to deliver power where it’s needed to complete the bore in the most efficient manner, without compromising power to the other machine functions.[…]

Read more

Sustainable Energy Utility Model

in Aug 08, 2018

Innovative Utilities (UK) Limited is now entering into the energy and multi utility infrastructure asset ownership market. We will specialise in the sale and delivery of sustainable innovative energy solutions. Innovative Utilities (UK) Limited will provide design, build, contract and project management capability, with the assets being owned and operated by Innovative Utilities (UK) Limited. […]

Read more