- Location: Glasgow
- Duration: 3 months
- Client: Scottish Water
- Value: 300k
PROJECT DETAIL
Scope: Installation of 3.2k of Water Mains in the Drum Chapel DMA from 90mm to 160mm HPPE and in Urban environments.
The method of Installation is Open cut, Slip line and Pipe Burst.
The works are on type 3 / 4 roads, type 2 roads and verge. The Drumchapel is a very challenging area in a built-up environment within various housing schemes.
IU were requested to take over this project from another contractor JTC as the works were to challenging for the contractor.
The project was completed on time within budget