Daer Camps Ph1
Installation of 14k of Water Main in the Daer Camps DMA from 90mm to 450mm HPPE and Ductile Iron in both Rural and Urban environments. Including Under Pressure Connections on 21” Water Main.
Details
  • Location: Lanarkshire
  • Duration: 3 months
  • Client: Scottish Water
  • Value: 2.8m

PROJECT DETAIL

Scope: Installation of 14k of Water Main in the Daer Camps DMA from 90mm to 450mm HPPE and Ductile Iron in both Rural and Urban environments. Including Under Pressure Connections on 21” Water Main.
The works are on type 3 / 4 roads, type 2 roads, verge and field.
The method of Installation is Open cut, Slip line and Pipe Burst.
We were working in areas such as Hamilton, Garron Bridge, Stonehouse and Strathaven.
The project was completed on time within budget.