
- Location: Lanark
- Client: Scottish Water Solutions 2
- Duration: 6 months
- Value: 310k
Scope: – The project was to open cut a 250mm HPPE Pumped Sewer through field and carriageway including manhole chambers and twin directional drilling under the River Clyde and installation of a pumping station due to pump the waste water to the waste water treatment works at Netherburn.