
- Location: Lanarkshire
- Duration: 3 months
- Client: Scottish Water
- Value: 600k
Scope: Installation of 15k of Water Main in the Daer Daer DMA from 90mm to 450mm HPPE and Ductile Iron in both Rural and Urban environments.
The works are on type 3 / 4 roads, type 2 roads and verge.
The method of Installation is Open cut, Slip line and Pipe Burst.
We were working in areas such as Biggar, Shotts and Crawfordjohn.
The project was completed on time within budget.