Netherburn
The project was to open cut a 250mm HPPE Pumped Sewer through field and carriageway including manhole chambers and twin directional drilling under the River Clyde and installation of a pumping station due to pump the waste water to the waste water treatment works at Netherburn.
Details
  • Location: Lanark
  • Client: Scottish Water Solutions 2
  • Duration: 6 months
  • Value: 310k

PROJECT DETAIL

Scope: – The project was to open cut a 250mm HPPE Pumped Sewer through field and carriageway including manhole chambers and twin directional drilling under the River Clyde and installation of a pumping station due to pump the waste water to the waste water treatment works at Netherburn.