- Location: Lanark
- Duration: 3 months
- Client: Scottish Water
- Value: 80k
PROJECT DETAIL
Scope: – Scottish Water have requested us to provide a detailed reinstatement proposal for Phillipshill WwTW based on the specific project information provided within Project Information 4033750045 PIF Repair access road within the WwTW (main access route from gates through to Sludge Holding Tanks) that tankers utilise for moving sludge out the site. We have to install a new surface water drainage system including gullies and a holding tank. In addition, remove existing slabs around Phase A process plant / equipment and widen to 2m which require embankment stabilisation by using Gabon baskets and removal of all spoil off site.
The Project Objective was Mitigate two (2) in number health and safety issues at the site. The works were completed on time and within budget