Mallsheugh WWTW
The whole site required green security fencing to be installed on completion of the works.
Details
  • Location: Lanark
  • Client: Scottish Water
  • Duration: 3 months
  • Value: 140k

PROJECT DETAIL

Scope: Design and Build of sewage pumping station within a wastewater treatment works (WwTW) at Mallheugh including installation of 180HHPE waste water pipe approximately 1k and associated tie ins and air valves.

All site clearance works which required the installation of large manholes (wet wells) to locate the associated pumps. The new pumps the were installed to pump the wastewater into the nearest sewer network.

We installed green kiosk including plinths adjacent to the pumps which housed the electrical equipment and telemetry.

The whole site required green security fencing to be installed on completion of the works.