
- Location: Glasgow
- Duration: 1 months
- Client: Scottish Water
- Value: 100k
Scope: Install temporary access to allow tankers into treatment works. The Excavate main road / entrance / remove of existing road structure down to the solemn then build road make up back up in layers with super enriched surface coating 500m x 6m.
Full Road and footway Reinstatement including the installation of hell kerbs and bullnose kerbing.